全文获取类型
收费全文 | 284篇 |
免费 | 107篇 |
国内免费 | 10篇 |
出版年
2024年 | 1篇 |
2023年 | 3篇 |
2022年 | 8篇 |
2021年 | 8篇 |
2020年 | 14篇 |
2019年 | 6篇 |
2018年 | 10篇 |
2017年 | 16篇 |
2016年 | 21篇 |
2015年 | 21篇 |
2014年 | 19篇 |
2013年 | 17篇 |
2012年 | 24篇 |
2011年 | 26篇 |
2010年 | 14篇 |
2009年 | 26篇 |
2008年 | 17篇 |
2007年 | 12篇 |
2006年 | 23篇 |
2005年 | 24篇 |
2004年 | 20篇 |
2003年 | 7篇 |
2002年 | 8篇 |
2001年 | 7篇 |
2000年 | 13篇 |
1999年 | 10篇 |
1998年 | 14篇 |
1997年 | 1篇 |
1996年 | 3篇 |
1995年 | 1篇 |
1994年 | 1篇 |
1992年 | 2篇 |
1991年 | 1篇 |
1990年 | 1篇 |
1989年 | 2篇 |
排序方式: 共有401条查询结果,搜索用时 31 毫秒
121.
We study the problem of multimode scheduling tasks on dedicated processors, with the objective of minimizing the maximum completion time. Each task can be undertaken in one among a set of predefined alternative modes, where each mode specifies a required set of dedicated processors and a processing time. At any time each processor can be used by a single task at most. General precedence constraints exist among tasks, and task preemption is not allowed. The problem consists of assigning a mode and a starting time to each task, respecting processor and precedence constraints, to minimize the time required to complete all tasks. The problem is NP-hard in several particular cases. In previous works, we studied algorithms in which a solution was obtained by means of an iterative procedure that combines mode assignment and sequencing phases separately. In this paper, we present some new heuristics where the decision on the mode assignment is taken on the basis of a partial schedule. Then, for each task, the mode selection and the starting time are chosen simultaneously considering the current processor usage. Different lower bounds are derived from a mathematical formulation of the problem and from a graph representation of a particular relaxed version of the problem. Heuristic solutions and lower bounds are evaluated on randomly generated test problems. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 893–911, 1999 相似文献
122.
Scheduling a set of n jobs on a single machine so as to minimize the completion time variance is a well‐known NP‐hard problem. In this paper, we propose a sequence, which can be constructed in O(n log n) time, as a solution for the problem. Our primary concern is to establish the asymptotical optimality of the sequence within the framework of probabilistic analysis. Our main result is that, when the processing times are randomly and independently drawn from the same uniform distribution, the sequence is asymptotically optimal in the sense that its relative error converges to zero in probability as n increases. Other theoretical results are also derived, including: (i) When the processing times follow a symmetric structure, the problem has 2⌊(n−1)/2⌋ optimal sequences, which include our proposed sequence and other heuristic sequences suggested in the literature; and (ii) when these 2⌊(n−1)/2⌋ sequences are used as approximate solutions for a general problem, our proposed sequence yields the best approximation (in an average sense) while another sequence, which is commonly believed to be a good approximation in the literature, is interestingly the worst. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 373–398, 1999 相似文献
123.
Zhi-Long Chen 《海军后勤学研究》1998,45(3):279-295
We consider the parallel replacement problem in which machine investment costs exhibit economy of scale which is modeled through associating both fixed and variable costs with machine investment costs. Both finite- and infinite-horizon cases are investigated. Under the three assumptions made in the literature on the problem parameters, we show that the finite-horizon problem with time-varying parameters is equivalent to a shortest path problem and hence can be solved very efficiently, and give a very simple and fast algorithm for the infinite-horizon problem with time-invariant parameters. For the general finite-horizon problem without any assumption on the problem parameters, we formulate it as a zero-one integer program and propose an algorithm for solving it exactly based on Benders' decomposition. Computational results show that this solution algorithm is efficient, i.e., it is capable of solving large scale problems within a reasonable cpu time, and robust, i.e., the number of iterations needed to solve a problem does not increase quickly with the problem size. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 279–295, 1998 相似文献
124.
We consider the problem of scheduling multiprocessor tasks with prespecified processor allocations to minimize the total completion time. The complexity of both preemptive and nonpreemptive cases of the two-processor problem are studied. We show that the preemptive case is solvable in O(n log n) time. In the nonpreemptive case, we prove that the problem is NP-hard in the strong sense, which answers an open question mentioned in Hoogeveen, van de Velde, and Veltman (1994). An efficient heuristic is also developed for this case. The relative error of this heuristic is at most 100%. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 231–242, 1998 相似文献
125.
We consider a single-machine problem of scheduling n independent jobs to minimize makespan, in which the processing time of job Jj grows by wj with each time unit its start is delayed beyond a given common critical date d. This processing time is pj if Jj starts by d. We show that this problem is NP-hard, give a pseudopolynomial algorithm that runs in time and O(nd) space, and develop a branch-and-bound algorithm that solves instances with up to 100 jobs in a reasonable amount of time. We also introduce the case of bounded deterioration, where the processing time of a job grows no further if the job starts after a common maximum deterioration date D > d. For this case, we give two pseudopolynomial time algorithms: one runs in O(n2d(D − d) time and O(nd(D − d)) space, the other runs in pj)2) time and pj) space. © 1998 John Wiley & Sons, Inc. Naval Research Logistics 45: 511–523, 1998 相似文献
126.
We consider a class of production scheduling models with m identical machines in parallel and k different product types. It takes a time pi to produce one unit of product type i on any one of the machines. There is a demand stream for product type i consisting of ni units with each unit having a given due date. Before a machine starts with the production of a batch of products of type i a setup cost c is incurred. We consider several different objective functions. Each one of the objective functions has three components, namely a total setup cost, a total earliness cost, and a total tardiness cost. In our class of problems we find a relatively large number of problems that can be solved either in polynomial time or in pseudo‐polynomial time. The polynomiality or pseudo‐polynomiality is achieved under certain special conditions that may be of practical interest; for example, a regularity pattern in the string of due dates combined with earliness and tardiness costs that are similar for different types of products. The class of models we consider includes as special cases discrete counterparts of a number of inventory models that have been considered in the literature before, e.g., Wagner and Whitin (Manage Sci 5 (1958), 89–96) and Zangwill (Oper Res 14 (1966), 486–507; Manage Sci 15 (1969), 506–527). © 2008 Wiley Periodicals, Inc. Naval Research Logistics, 2008 相似文献
127.
本文利用(c,h,a)三参数旋转体模型计算了形变核的相对表面能、相对库仑能及相对转动能。这些相对能量与具体核无关,具有普适性,可以用于核裂变动态过程的模拟计算。利用这些结果,计算了一些核的形变位能随三参数变化的情况,给出了裂变位垒高度,与实验结果符合较好。对~(236)U的形变位能曲面作了较详细的分析,得出一些有益的结论。用Werner—Wheeler方法计算了形变核的惯性质量和粘滞张量随三参数变化情况,对断点线方程作了深入讨论,为核裂变动态过程的计算机模拟准备了必要的系数。 相似文献
128.
129.
130.